The project comprises the demolition of a neighbouring bungalow and construction of a standalone block to convert Gt Kimble Infant School to a primary school.

 

The new block provides 2 additional classrooms, a new main hall and associated accommodation together with external works on a sloping site. 
The compact design was developed in close consultation with all stakeholders.

 

The planning process was sensitive with the site being in Green Belt and AONB.

​

Following appointment, we identified a number of areas in the procured feasibility study proposals where we could improve the organisation, buildability / cost and design aesthetics.

​

  • Appointed following a competitive tender.

  • Prepared concept studies based on previous viability study.

  • Small, tight site in Green Belt and AONB, with complex levels.

  • Managed stakeholder consultations Bucks CC Project Officer, School representatives and local residents and parents.

  • Managed tender and selection process for main contractor.

  • Managed the team through production, tender and construction stages.

​

The new accommodation comprises:

​

  • 2 KS 2 classrooms with cloaks areas

  • New School Hall / Dining

  • Kitchen

  • Pupil toilets

  • External learning space

 

The design benefits from attention to detail internally and externally

in particular with some intricate brick detailing.

​

Project Information

Location

Gt Kimble, Buckinghamshire

Value

£1 m

Status

Commenced November 2018

Completion October 2019

Duties

Concept designer.
Project Team Lead.
Stakeholder engagement.
Planning Application.
Production Information.
Tender.
Contract Administration.

first floor plan.jpg

Contour Architecture Ltd.

85-87 High Street, Berkhamsted

HP4 2DF

01442 910 630.

office@contour-architecture.com

  • LinkedIn
  • Black Facebook Icon

Accredited by:

CONTOUR

© Contour Architecture 2025

bottom of page